Monday, November 9, 2026

Operating Session 30

   Operating session #30 took place on Monday 11/9/2026. The session started at 1:25 PM railroad time, and ended at 7:38 PM railroad time.  This was a session was the 2nd session of a 2 part operation session series, where the first session was earlier in the day on Bill S's Chicago & North Western layout.  We ran at a 3:1 clock ratio.  I had 7 crew for this session, with three of them being first timers on my layout. We ran a slightly short session since most of the crew had run another session earlier in the day, and a couple of the crew had also been at another session in the morning, making this their third op session in a day!  A couple also had to leave early.


Here were the assignments for the session, afternoon of Saturday 9/26/1959:
  • Clock on at 1:25 PM
  • 1:25 PM ATSF/P&E/C&IM/P&PU dispatcher on duty.  Dan J, all session job.
  • 1:25 PM PE Pekin switcher on duty.  Elliott D.
  • 1:25 PM ATSF Pekin switcher on duty.  Mitch R.
  • 1:25 PM PPU switcher on duty.  Andy H.
  • 1:30 PM ATSF Westward extra local freight from Streator.  Jerry Z.
  • 1:35 PM 12:50pm PE #95 Westward freight from PE staging (Bloomington).  Delayed, Bob M.
  • 1:45 PM ATSF Eastward extra coal empty from East Yard.  Bob D.
  • 2:00 PM PE #12 Eastward passenger from East Peoria. Larry B.
  • ~ 3:05 PM CIM #7 Southward freight from East Peoria.  Bob D.
  • 3:15 PM ATSF #13 Westward passenger from ATSF staging (Streator).  Bob D.
  • 3:30 PM ATSF #50 Eastward way-freight from East Yard.  Bob D.
  • 4:30 PM PE #90 Eastward freight from East Peoria.  Delayed, did not run.
  • 6:00 PM Eastward local extra from East Yard.  Jerry Z.
  • 6:30 PM 4:45 PM ATSF #49 Westward way-freight from ATSF staging (Streator).  Delayed, Bob D.
  • ~ 6:45 PM ATSF Westward coal extra from Streator.  Did not run.
  • 7:00 PM ATSF #18 Eastward mail and express from Pekin.  Delayed, Did not run.
  • Clock off at 7:38 PM
ATSF train orders active from previous session or issued during this session, afternoon of Fri 9/25/1959:
Order #ToBodyComplete
5C+E Eng 707 at StreatorENGINE 707 RUN EXTRA STREATOR TO EAST YARD1:15 PM
6C+E Extra 707 West at Roanoke
C+E Extra 1154 East at East Yard
EXTRA 707 WEST MEET EXTRA 1154 EAST
AT ROANOKE
1:32 PM
7C+E Eng 1154 at East YardENGINE 1154 RUN EXTRA EAST YARD TO STREATOR1:35 PM
8C+E No 49 at StreatorNo 49 RUN 1 HOUR LATE4:30 PM
9C+E Eng 721 at East YardAFTER EXTRA 707 WEST ARRIVES EAST YARD
ENGINE 721 RUN EXTRA EAST YARD TO STREATOR
5:23 PM


PE train orders active from previous session or issued during this session, afternoon of Friday 9/25/1959:
Order #ToBodyComplete
1C+E No 95 at Bloomington
C+E No 12 at Pekin
No 12 MEET No 95 AT EAST YARD
No 95 TAKE YARD TRACK 4
12:50 PM

No CIM train orders issued during this session, morning of Friday 9/25/1959:
Order #ToBodyComplete







Final thoughts:
  • The layout ran well.  The recent completion of installing frog juicers on every* turnout frog on the layout has eliminated any hesitation as locomotives cross some of the previously unpowered turnout frogs.  * = Every turnout frog other than those in the "temporary" staging yard.
  • The session was a success and I think everyone had fun.