Operating session #28 took place on Friday 9/25/2026. It just so happened that it was Friday 9/25 both on the railroad calendar and in real life. The session started at 6:30 AM railroad time, and ended at 4:00 PM railroad time. This was a session for the Amrail Ops weekend. We ran at a 3:1 clock ratio. Five out of the six crew members were new to the layout.
- 6:00 AM ATSF/P&E/C&IM/P&PU dispatcher on duty. Dan J, all session job.
- 6:00 AM ATSF Pekin switcher on duty. David Z, all session job.
- 6:00 AM PPU yard switcher on duty. Speed M, all session job.
- Clock on at 6:30 AM
- 6:30 AM ATSF Eastward extra local freight from East Yard. John R.
- 7:00 AM ATSF #14 Eastward passenger from Pekin. Greg B.
- 7:30 AM PE #94 Eastward freight from East Peoria. Roger K.
- 7:45 AM ATSF #47 Westward green fruit express from ATSF staging (Streator). Steve S.
- 8:00 AM PE CP/AD switch job. (if PPU crew wants to run). Speed M.
- 8:00 AM ATSF Westward extra local freight from Streator. Roger K.
- 10:00 AM ATSF #48 Eastward through-freight from East Yard. Greg B,
- 10:15 AM CIM #6 Northward freight from CIM staging. Steve S.
- 11:00 AM ATSF Eastward coal empty extra from East Yard to ATSF staging (Streator). Steve S.
- 12:05 PM PE #11 Westward passenger from PE staging (Bloomington). John R.
- 12:20 PM ATSF #17 Westward mail and express from ATSF staging (Streator). Roger K.
- 12:50pm PE #95 Westward freight from PE staging (Bloomington). Roger K.
- 1:00 PM ATSF coal extra from ATSF staging (Streator) to Pekin. Greg B.
- 2:00 PM PE Pekin switcher on duty. Greg B, rest of session job.
- 2:00 PM PE #12 Eastward passenger from East Peoria. John R.
- 2:55 PM ATSF Eastward extra local freight from East Yard if needed. Roger K.
3:05 PM CIM #7 Southward freight from East Peoria.Delayed.- 3:15 PM ATSF #13 Westward passenger from ATSF staging (Streator). Speed M.
3:30 PM ATSF #50 Eastward way-freight from East Yard.Annulled.- Clock off at 4:00 PM
| Order # | To | Body | Complete |
|---|---|---|---|
| 1 | C+E Eng 721 at Pekin | ENGINE 721 RUN EXTRA PEKIN TO STREATOR | 6:12 AM |
| 2 | C+E No 14 at Pekin C+E No 47 at Streator | No 47 ENGINE 300L MEET No 14 ENGINE 83L AT ROANOKE. No 47 TAKE SIDING. | 6:23 AM |
| 3 | C+E Extra 721 East at Morton C+E Extra 2105 West at Streator | EXTRA 2105 WEST MEET EXTRA 721 EAST AT MORTON | 7:34 AM |
| 4 | C+E Eng 2105 at Streator C+E Extra 721 East at Morton | AFTER No 14 ENGINE 83L ARRIVES STREATOR ENGINE 2105 RUN EXTRA STREATOR TO EAST YARD LEAVE ROANOKE 8:45 AM LEAVE WASHINGTON 9:15 AM | 7:41 AM |
| 5 | C+E Eng 38C at East Yard | AFTER EXTRA 3105 WEST ARRIVES EAST YARD ENGINE 38C RUN EXTRA EAST YARD TO STREATOR | 10:46 AM |
| 6 | C+E Extra 38C East at Morton C+E Extra 1011 West at Streator | EXTRA 1101 WEST MEET EXTRA 38C EAST AT ROANOKE | 12:42 PM |
| 7 | C+E Eng 1101 at Streator | ENGINE 1101 RUN EXTRA STREATOR TO EAST YARD | 12:53 PM |
| 8 | C+E Eng 1166 at East Yard | ENGINE 1166 RUN EXTRA EAST YARD TO STREATOR | 2:55 PM |
| 9 | C+E Extra 1166 East at East Yard C+E No 49 at Streator | TRAIN No 50 IS ANNULLED | 3:01 PM |
| Order # | To | Body | Complete |
|---|---|---|---|
| Order # | To | Body | Complete |
|---|---|---|---|
- The layout ran well. The recent completion of installing frog juicers on every* turnout frog on the layout has eliminated any hesitation as locomotives cross some of the previously unpowered turnout frogs. * = Every turnout frog other than those in the "temporary" staging yard.
- Even though five out of the six crew were new to the layout this was a very skilled crew who picked up on things quickly.
- The session was a success and I think everyone had fun.
- I look forward to hosting again for future Amrail Ops weekends.