Saturday, December 7, 2019
More P&E staging tracks built
P&E staging has been improved to support a more realistic schedule for the Peoria and Eastern. Now with two 7ft hidden staging tracks I can support two freights each way, and a passenger train each way. Additionally a too tight curve on the 2% grade from staging was ripped up and re-laid with about a 16" radius. Previously a single engine could only pull 8 cars up from staging. Now that same engine can pull 14 cars. I've learned to never go for an excessively tight radius, even in hidden trackage by staging.
Labels:
Layout Construction
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment