PPU east peoria yard switcher

P&PU East Peoria yard switcher.  The primary purpose of this all day job is to sort cars, and make up and break up trains.

Typical day on the job:
  • Prepare/Build P&E #94 for 7:30am departure. Group any cars destined for Pekin into a single block at either the front or rear of the train.
  • Make ATSF transfer run.
  • Sort cars in yard if needed.  One track per destination (ATSF, CIM, PE, PPU + non-modeled railroads)
  • Receive ATSF transfer run.
  • Receive and breakdown C&IM #6 at 10:25am.
  • Receive and turn P&E #11 at 12:30pm.
  • Receive and breakdown P&E #95 at 1:30pm.
  • Make ATSF transfer run.
  • Receive ATSF transfer run.
  • Prepare P&E #12 for 2:00pm departure.
  • Prepare/Build C&IM #7 for 3:05pm departure.
  • Prepare/Build P&E #90 for 4:30pm departure. Group any cars destined for Pekin into a single block at either the front or rear of the train.
  • Receive and breakdown C&IM evening extra freight.
  • Prepare/Build C&IM evening extra freight.
  • Receive and breakdown P&E #95 at 1:55am.

No comments:

Post a Comment